Installation
S19-220DCPT
Wall-Mounted Eyewash with
Dust Cover
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . .2
Installation Instructions . . . . . . . . . . . . . . . . . . . .3
Assembly of Components . . . . . . . . . . . . . . . . . .4
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
215-1255 Rev. D; EN 06-532G
© 2007 Bradley Corporation
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 1-800-BRADLEY FAX (262) 251-5817
Page 1 of 4
4/30/07
Installation
S19-220DCPT
Installation Instructions
NOTE: Flush the water supply line
before beginning installation.
4-5/8"
(119mm)
8-1/4"
(210mm)
Supplies Required:
• (3) 3/8" wall fasteners and bolts
• Pipe sealant
13-5/8"
(346mm)
• Piping to 1/2" IPS water supply inlet
on unit
• Sign-mounting hardware
Ø10-3/4"
(273mm)
Step 1: Install inlet drain fittings
21-1/2"
(546mm)
NOTE: Top of eyewash heads should be
33"-45" (838mm-1142mm) from floor.
17-1/4"
(438mm)
1. Position the inlet drain fitting over
the 1-1/4" drain outlet pipe from
wall.
2. Using the inlet drain fitting as a
template, mark the bolt hole
locations on wall OR install three
suitable fasteners (supplied by
installer) for 3/8" bolts in the wall
at the marked hole locations (see
Figure 1).
8-3/4"
(222mm)
4"
(102mm)
2-1/4"
(57mm)
5/16"
(8mm)
MTG.
5-1/4"
133mm)
3. Bolt the inlet drain fitting to the
wall or wall fasteners using 3/8"
bolts (supplied by installer).
HOLE
Step 2: Assemble eyewash
1. Assemble eyewash components as
shown in Figure 2 on page 4.
• Apply pipe sealant (supplied by
installer) to all male-threaded
pipe joints.
• Use a strap wrench around pipes
when tightening to prevent
marring.
36" (914mm)
Suggested
Height
To Floor
Step 3: Connect water supply
30-1/2" (775mm)
Suggested
Height
8-3/4"
(222mm)
1. Connect the water supply piping
(supplied by installer) to the 1/2"
IPS inlet on the eyewash.
To Floor
14"
(357mm)
2. Connect the P-trap and tailpiece to
the 1-1/4 IPS drain outlet on the
eyewash.
Figure 1
3. Mount the safety sign to a wall or
pipe using sign-mounting hardware (supplied by installer).
4. Open the water supply lines. Test for leaks and adequate water flow.
Bradley Corporation • 215-1255 Rev. D; EN 06-532G
4/30/07
3
S19-220DCPT
Installation
Assembly of Components and Parts List
1.6
7
1.5
Flow Control
This End
P
.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
114-051
1.4
1
8
1.9
R
P
.O. Box 309, Menomonee Falls, WI 53051
1.7
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il
y
à
quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
1.3
1.8
1.2
1/2" IPS
Supply Inlet
1.1
HANDLE NOTE:
Close the cover and
put the pin through
the clip to keep closed.
4.1
1-1/4" IPS
Drain Outlet
4.3
2
3
4.4
4.2
5
4.11
NOTE: Items 1.1 -1.9 come presasembled as Item 1.
Figure 2
6
Item Part No.
Qty
1
Description
Item Part No.
Qty
1
Description
Elbow 1/2" IPS Street
1/2" Valve/Handle Prepack
1/2" Ball Valve with Nut
Nut only
1
S90-301
111-061
124-028
S90-009
173-009
S21-071
S05-091
269-447
161-025
113-1159
113-006LQ
Dust Cover /Receptor Assembly
Inlet-Drain Fitting
Gasket
3
4
169-025
S30-072
S27-282
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
1
1
1
4.1
1
1
Dust Cover Assembly
Cup Strainer
4.11 110-215
1
1
4.2
4.3
4.4
5
S08-056
142-002DA
153-372R
269-167
269-142
114-051
1
Handle Assembly
Lockwasher
1
Supply Stem
1
1
Eyewash Yoke
Bumper
1
Adapter
1
1
Tailpiece
1
Hex Nut
6
1
Trap
1
Spacer, Drain
7
1
Safety Sign
1
Pipe 1/2" IPS x 3-1/2" Long
8
204-421
1
Emergency Tag
Prepack S30-087 includes items 4.11, 4.2, 4.3, 4.4
4
4/30/07
Bradley Corporation • 215-1255 Rev. D; EN 06-532G
|