A P P E N D I X
A
Task Lists
Task List for MGX 8240 Private Line Service Gateway
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Prepare site
Unpack/Required tools
Inventory parts
Check condition
Physically mount chassis
Check cable length
Check air flow ventilation and obstruction
Check air for contamination, humidity, and temperature
Mount I/O cards (including IMC I/O)
Mount PSM cards and IMC card
Connect bits clocks (if necessary)
Check voltage
Install power
Connect power from chassis to power source
Check fuses (if used)
Check voltage
Check Ready LED
Configure PC/terminal
Check software versions and revisions
Perform FDOS
Task List for Common Interface Module
•
•
•
Prepare site
Unpack/Required tools
Inventory parts
Cisco MGX 8240 Hardware Installation Guide
Release 2.2, 78-10084-01, November 1999
A-1
|